Tides are predictable for years, making tidal power the most forecastable marine energy; wave and OTEC trade predictability and scale for abundance.
Core Principles
- Tidal forces: Moon and Sun gravity plus Earth rotation create two tidal bulges daily
- Stream devices: harness moving currents in narrow channels, no dam needed
- Barrage devices: trap basin water behind a dam, generate on ebb, flood or two-way
- Wave energy: ~2 m waves carry ~50 kW/m; storms exceed wind extremes
- OTEC: surface water warms, deep water ~5°C; temperature difference drives turbines
Action Steps
- Screen sites for tidal range above 8 m (La Rance: 8.5 m) to justify barrage investment
- Check channel flow speed and narrow passage for stream turbine siting
- Estimate barrage output using η ≈ 0.33 (capacity factor 20–35%)
- Use 706 tidal cycles/year (12 h 24 min each) in annual energy estimates
- Size OTEC intake: 4 m³/s warm and 2 m³/s cold seawater per MW
Formulas
- Stream power: $$P = \frac{\rho A V^3}{2} C_P$$
- Stream resource: $$P = 0.22\,\rho\, g\, \Delta H_{max}\, Q_{max}$$
- Barrage energy: $$E = 1397\,\eta R^2 A$$
- Barrage annual energy: $$E_{yr} = 0.997\times10^{6}\,\eta R^2 A$$
- Wave power: $$P = \frac{\rho g H_s^2 T}{64\pi}$$
Key Terms
- Tidal barrage: Dam-like structure across a bay or estuary that captures tidal water movement to drive turbines.
- Tidal stream: Turbines placed in fast-moving tidal currents, extracting kinetic energy without impounding water.
- Oscillating water column: Chamber where waves push air through a turbine, driving it as water rises and falls inside.
- Overtopping device: Structure channeling waves over a raised reservoir, then draining water back through low-head turbines.
- Closed-cycle OTEC: Warm seawater boils a working fluid in a heat exchanger, which drives the turbine.
- Capacity factor: Ratio of actual energy output to maximum possible output over time.
Pro Tips
- Tides are predictable years ahead, unlike wind, so grid planning beats wind variability.
- Seawater is 800× denser than air, so tidal rotors can be far smaller than wind turbines.
- Open-cycle OTEC condenses fresh water, so one plant yields both power and drinking water.
- OTEC efficiency falls from 6.7% theoretical to 2–3% once cold-water pumping is counted.
- Wave energy is more predictable than wind, but available energy drops near shore.
Pitfalls to Avoid
- Ignoring cold-water pipe cost: OTEC needs ~1000 m pipe, 3.5 km for Hawaii land plants.
- Choosing sites with small tidal range: barrages only pay off where range is large.
- Overlooking silt build-up behind barrages, which traps pollutants in mud.
- Assuming OTEC costs are known: capital starts near $4000/kW with no reliable electricity cost estimate.
- Shutting down wave farms on business grounds: Aguçadoura stopped after two months.
Myth vs Reality
- All coastlines get two equal high tides daily.: Continents block tidal bulges, so locations are semidiurnal, diurnal or mixed; diurnal sites have one high tide daily.
Real World Examples
- La Rance, France (1966): 24 turbines, 8.4 m mean range, 22 km² basin: Proves barrage viability in high-range estuaries; ran 45 years as world's largest.
- Pelamis wave farm, Aguçadoura, Portugal: three 750 kW units: Shows technical feasibility; shut after two months due to business issues.
Statistics
- La Rance barrage output (2011 status: world's largest 1966–2011): 240 MW, capacity factor 26%
- Sihwa Lake station (South Korea, started 2011): 254 MW, 550 GWh per year
- Annapolis tidal (Nova Scotia, 1984): 20 MW
- Wave energy flux at ~2 m wave height: ~50 kW/m
- MCT Seagen turbine size: 750 kW–1.5 MW, 15–20 m rotors
- OTEC capital cost starting point: ~$4000/kW
- Tidal turbine worldwide capacity ceiling: <100 GW
Timeline
- 1966: La Rance barrage opens in France, becoming world's largest tidal plant
- 1984: Annapolis tidal plant starts in Nova Scotia (20 MW)
- 1986: TAPCHAN overtopping wave plant built in Norway
- 1993–1998: 210 kW open-cycle OTEC pilot runs in Hawaii
- 2003: Wave Dragon overtopping prototype deployed at Nissum Bredning Fjord, Denmark
- 2011: Sihwa Lake station (254 MW) starts; Nissum prototype scrapped